Article 04For: Plant manager18 Nov 20264 min read

Make to order: when every order needs its own bill of materials

Product variants fail when each order is different. How a make-to-order factory gets a bill of materials for each order in Odoo 19, from the specs of the customer.

In short. Product variants work when a product has a few fixed options. They fail when each order has its own sizes and materials. In our case, staff enter the specs of the customer, and the ERP calculates the materials, the operations and the bill of materials (BoM). The plant has 35,400 products and 33,073 BoMs.

Make to order (MTO) has more than one meaning. In some plants, it means "start after the order". In other plants, it means "each order is a new product". The second type needs a BoM for each sales order, and standard tools do not make one.

Which type of production do you have?

Type Short name When the work starts The BoM
Make to stock MTS Before a buyer is known One fixed BoM for each product
Configure to order CTO After the order, from fixed options Variants of one BoM
Make to order, from the specs of the customer MTO After a confirmed order A new BoM for almost each order
Engineer to order ETO After the order, design included Engineers design the product and its BoM

This article is about the third row.

When are product variants not enough?

Standard Odoo 19 has good tools for options:

  • Variants from attributes. Odoo can create a variant only when someone orders it (the "Dynamically" mode).
  • BoM lines that apply to some variants only ("Apply on Variants").
  • The route "Replenish on Order (MTO)". It creates a manufacturing order when you confirm a sales order.

These tools select from parts that you defined before the order. A BoM line holds a fixed quantity. The documentation pages that we read show no quantity that comes from a formula or from dimensions.

Thus, when the customer gives a length, a width, a height and a material, someone must calculate the BoM. Before the ERP, the plant in our case did this work in Excel files.

Where does the BoM of the order come from?

In our case, the product is a box. Staff enter the specs of the box. The ERP calculates the paper, the sheet size, the operations and the BoM. Engineers adjust the result in a drag-and-drop designer.

What Number on 18 November 2026
Products 35,400
Bills of materials 33,073
Work centres 160
Manufacturing orders finished in 30 days 236
Work orders in 30 days 805

How do you quote before the BoM is final?

You calculate it. In our case, the ERP calculates the BoM from the specs before anyone quotes or plans. Thus the quote and the plan use the same numbers.

How we did it

  1. Sales with BoM calculation first. The first module reached the repository on 21 April 2025, three days after the start of the work.
  2. A designer for engineers. Engineers lay out BoMs and operations in a drag-and-drop designer. The first version dates from February 2026.
  3. Changes with approval. A change to a product goes through an engineering change order with approval.
  4. Corrections on the floor. A running order with a wrong BoM can be corrected. Steps that nobody registered close themselves after 24 hours.
  5. Samples in the same system. The ERP tracks each sample from its making to the answer of the customer.
  6. The full flow. On 4 October 2026, the flow from order to delivery went live.

Does this work outside packaging?

The pattern is: specs in, materials and operations out. It applies where dimensions and material define the product. Examples are cut sheet metal, wood panels, printed labels and cable sets.

Our live case is packaging. For a different product, we write the rules of that product.

When does this not fit?

  • You make to stock from a fixed catalogue. Standard BoMs are sufficient.
  • Your product has a few options. Use variants.
  • You design each product in CAD. The BoM then comes from the CAD system. You need a link to it, not a calculator.
  • Nobody can state the rules. If the calculation is in the head of one person, write it down first.

What to send us

  1. Three typical orders, with their specs.
  2. How you calculate materials today: an Excel file, a person or a tool.
  3. The number of new products for each month.

Read next: Try a simplified calculation · Odoo Community vs Enterprise for manufacturing · Talk to us

Sources

Do you have this question in your plant?

Tell us what you make, how many people work in your plants, and which tools you use today. We answer in English or Vietnamese.