ERP user adoption: why workers do not use the ERP, and what we changed
Workers go back to paper when the ERP does not fit the work. Studies from 2005 to 2022 name usability and fit. What a plant with 500+ people changed: 7 causes, 7 answers, and 8 questions for an owner.
In short. Workers go back to paper when the ERP does not fit their work. Studies from 2005 to 2022 name the same causes: low usability, a poor fit with the task, and little training. In our Case 01, a plant with more than 500 people, we changed 7 things in the software. The ERP is in Vietnamese, runs on phones, and has more than 40 guides in two languages. A usage log shows which screens people use.
Factory owners who paid for software before ask this question. The system went live, and some months later the floor was back on paper and Excel. Many people then say that the workers resist change. We look at the software first.
Why do ERP projects fail on the user side?
Users stop when the system is hard to use, or when it does not fit their task. Research has shown this since 2005.
- 2005, a case study. In a large government agency, users first avoided the new ERP as much as possible. Later, they worked around its limits.
- 2019, Vietnam. A study asked 225 people in enterprises with an ERP. A good fit between task and technology went together with higher job performance.
- 2021, Vietnam. A survey got 402 answers from ERP users in 63 enterprises. People intended to use the ERP when they saw it as useful.
- 2022, after go-live. A study names user resistance as one of the main causes of ERP failure. The main causes of the resistance were risk barriers and usability barriers.
- 2022, 9,600 frontline workers. A Microsoft survey covered eight industries, manufacturing included. 55% learned digital tools with no formal training. One-third said that they do not have the right technology for the job. 63% were excited about the job opportunities that technology creates.
These workers do not refuse technology. In 2025, Panorama Consulting Group called resistance in manufacturing "often a rational response to risk".
What do Vietnamese pages on "kinh nghiệm triển khai ERP" say?
They give the project steps, and they name staff resistance as a risk. They do not show what to change in the software for a worker at a machine.
On 24 November 2026, we read three supplier pages from a search for these words. Together, they advise early communication, pilot users, training for each role, and a review in the first months. None covers the language of the screen, the device at the station, or a forgotten password. None shows how to measure which screens people use.
A 2018 article in Tạp chí Công Thương gives two figures. 86.85% of the enterprises looked at the fit with their needs. 42.57% looked at user training.
Why do workers not use the ERP on a factory floor?
A standard ERP screen is made for a desk, and a worker stands at a machine. We see seven causes, and each cause has an answer in the software.
| Cause | The effect | What Case 01 changed |
|---|---|---|
| A screen made for an office | Small buttons are slow for a person who stands | An own shop floor screen for phones, with large buttons |
| Too many fields | Each added field is a reason to use paper | One number field for the quantity. Read-only warehouse screens, one for each station |
| The wrong language | The worker must guess what a button does | More than 23,000 texts of our modules have a Vietnamese translation |
| No device at the work station | The data goes in later, from memory | Workers record jobs and quantities on a phone at the line |
| A login that people forget | The work waits for an administrator | "Forgot password?" on the login page, with a code by SMS |
| No fast help | The person asks a colleague, or stops | Guides in the ERP, and a question assistant in the chat |
| No check of real use | The owner learns about the problem months later | A usage log of screens, buttons, reports and errors |
How Case 01 does it
Case 01 is a Vietnamese packaging manufacturer with more than 500 people in two plants. It runs Hoply.Works ERP, built on open-source Odoo Community, with 57 custom modules.
- Screens for the work station. The shop floor screen shows the work orders of the day as cards, one in each row on a phone. A worker starts a job, records the quantity and closes the job. Our article on the shop floor screens describes them.
- Vietnamese first. Users work in Vietnamese. Odoo supplies a Vietnamese translation of its standard screens, and our modules add their own. In standard Odoo, each user selects the language.
- Guides in the ERP. The Tutorials app (Hướng dẫn) has more than 40 guides, each in Vietnamese and English, with screen images. A user sees the guides of the apps that the user can open. An automated check compares the button names in a guide with the code and the Vietnamese translation.
- A password that the user can repair. There is one company login. Standard Odoo sends a reset link by e-mail. In Case 01, the user gets a code by SMS on a confirmed phone number, then sets a new password. Our article on one login gives the steps.
- Help in the chat. A user with the assistant role asks the question assistant in the company chat. The assistant answers in the language of the user, from the records that the roles of that user can read. A user can also report a problem there. The assistant asks what the user did, what happened and what the user expected. Our article on local AI describes the AI functions.
- Roles in plain words. The Role Map (Bản đồ quyền) has a card for each role, with a Vietnamese text. The card says what the role is for, what its holder can do and what could go wrong.
What does the usage log record, and what does it not record?
It records which screens, buttons and reports people use, and the errors that they see. Its purpose is to reorganise the menus and the screens on facts.
- Off by default. An administrator turns it on. The setting says: tell staff first.
- One event. It holds the user, the device type, the screen and the time. Thus an administrator can see the events of one person.
- Not in the log. It does not keep the values of fields or a scanned code. It does not keep the text of a search or of a message.
- Error messages. The log masks each number of three digits or more. For records about people, it keeps no message text.
- Unused menus. One report shows how often people opened each menu, and the menus that nobody opened.
- Access and time. Only system administrators can read the log. The ERP deletes events after 90 days by default.
- Personal data. An event names a person, thus the log holds personal data. Tell the staff what the log records, and why. Check the personal data rules that apply to your company.
What Case 01 does not do yet
- Guides for each user. A user who can open none of the apps with guides sees no guide yet.
- A check of understanding. The ERP has no test after a guide. The usage log shows use, not understanding.
- The assistant for each user. Only users with the assistant role get answers.
- A help button on each screen. There is none. Help is in the Tutorials app and in the chat.
- An adoption figure. We publish no figure from the usage log.
- Training. The ERP does not replace a person who trains the workers at the machine.
What can an owner check in any ERP project?
Ask the supplier these eight questions, and ask for a demonstration of each answer.
- Can I see the screen of one worker, on the device at that station?
- How many fields does that worker fill in for one job?
- Are the screens, the error messages and the guides in the language of the workers?
- Which device is at each station, and who supplies it?
- How does a worker get a new password during the night shift?
- Where does a worker find help from the screen?
- How do we see which screens people use, three months after go-live?
- What does the usage record keep about a person, and who reads it?
When does this not fit?
- The process is not agreed. If two departments use different rules, a screen cannot correct that.
- There is no device and no network at the station. Then a phone screen does not help. Solve this first.
- You want to rate each worker from the log. The usage log is made to reorganise menus and screens. It does not keep the values that a person enters.
What to send us
- The three work stations where people use paper or Excel today.
- The device at each of these stations: none, a phone, a tablet or a computer.
- The languages that your workers read.
Read next: Is Odoo free? What you pay for, and what you do not · Local AI for a factory ERP · Case 01: people on the floor · Talk to us
Sources
- Boudreau and Robey (2005), "Enacting Integrated Information Technology: A Human Agency Perspective", Organization Science 16(1)
- Pham Quang Huy, Vo Van Nhi and Pham Tra Lam (2019), "The Interaction Effect of Task – Technology Fit and Job Satisfaction on Job Performance in ERP Context", Eurasian Journal of Economics and Finance 7(1)
- Minh-Duc Le (2021), "User acceptance of enterprise resource planning systems: a study in small and medium enterprises in Vietnam", International Journal of Entrepreneurship and Innovation Management 25(1)
- Assefa (2022), "User resistance in post enterprise resource planning implementation phase", SINET: Ethiopian Journal of Science 45(1)
- Microsoft Work Trend Index special report (2022), "Technology Can Help Unlock a New Future for Frontline Workers"
- Panorama Consulting Group (2025), "ERP Resistance in Manufacturing Can Tank User Adoption"
- Mai Hải An and Lê Việt Hà (2018), "Giải pháp triển khai hệ thống hoạch định nguồn lực doanh nghiệp ERP tại các doanh nghiệp Việt Nam", Tạp chí Công Thương
- Odoo documentation: users, access rights and password reset
- Odoo documentation: change languages
- Odoo source code: the Vietnamese translation of the standard web screens
- Hoply.Works, Case 01: the code of the live system, read on 24 November 2026.